Land surveyor with total station equipment in the field
What We Do

Full-Scope Survey & Engineering Services

From the first boundary pin to the final permitted site plan, CE-SITE delivers every technical layer your Southwest Florida development project requires.

One Firm. Every Phase.

CE-SITE is a licensed surveying and civil engineering firm built specifically for the pace and complexity of real estate development in Southwest Florida. We work with developers, builders, and land investors across Lee, Henry, Charlotte, Sarasota, and Manatee counties.

Our team of licensed Professional Surveyors & Mappers (PSM) and Professional Engineers (PE) delivers accurate, permit-ready work the first time — so your project doesn't stall waiting on revisions or agency rejections.

Service Breakdown

Every Service We Offer

01

Land Surveying

Accurate measurements. Legal certainty.

Our licensed surveyors perform comprehensive field surveys using GPS, total stations, and drone-assisted data collection. Every survey is signed and sealed by a Florida-licensed PSM.

GPS and robotic total station field work
Signed and sealed by Florida-licensed PSM
CAD deliverables formatted for your team
Southwest Florida coverage — Lee, Collier, Charlotte, Sarasota, Manatee

02

Boundary & Lot Surveys

Define what's yours. Protect your investment.

We establish and certify legal property boundaries for transactions, title insurance, disputes, and permitting. Our boundary and lot surveys meet all Florida Statutes Chapter 472 requirements and are formatted for title companies, lenders, and local permitting offices.

Title company and lender compliant
Encroachment and easement identification
Monument placement and documentation
Legal description review and preparation
Lot surveys for individual parcels and platted subdivisions
Signed and sealed by Florida-licensed PSM

03

Topographic Surveys

Know your terrain before you design.

Detailed elevation and terrain data for site design, grading plans, drainage engineering, and environmental review. We deliver high-resolution topo data in formats your engineers can use immediately.

1-foot and 0.5-foot contour intervals available
Drone LiDAR and traditional field methods
AutoCAD, Civil 3D, and GIS-compatible output
Utility and feature location included

04

Construction Stakeout

Put the plan on the ground. Precisely.

CE-SITE provides construction stakeout services that translate your engineered plans into physical control points in the field. Our crews work directly with your contractors to keep grading, foundations, utilities, and structures on layout — minimizing costly rework and keeping your schedule on track.

Foundation and building corner staking
Roadway and utility alignment staking
Grading and cut/fill stakeout
Horizontal and vertical control establishment
Coordination with general contractors and subs
GPS and robotic total station precision

05

Elevation Certificates

FEMA-compliant. Lender-ready. Fast turnaround.

CE-SITE prepares FEMA Elevation Certificates (EC) for residential and commercial properties throughout Southwest Florida. Required for flood insurance rating, building permits in Special Flood Hazard Areas (SFHA), and lender compliance, our ECs are completed by a licensed PSM and formatted to current FEMA standards.

FEMA Elevation Certificate (EC) — current form
Required for NFIP flood insurance rating
Lender and title company compliant
New construction and existing structure surveys
SFHA and AE, VE, and X zone properties
Signed and sealed by Florida-licensed PSM

06

Pool Surveys

Permit-ready pool location surveys for Southwest Florida builders.

CE-SITE performs pool location surveys required by Southwest Florida counties and municipalities before and after pool construction. Our surveys verify setback compliance, document the pool's position relative to property lines and structures, and are formatted to meet local building department requirements.

Pre-construction pool location stakeout
Post-construction as-built pool survey
Setback verification from property lines and structures
Formatted for county building department submittal
Fast turnaround to keep construction on schedule
Signed and sealed by Florida-licensed PSM

07

Real Estate Surveys

Transaction-ready surveys for buyers, sellers, and lenders.

CE-SITE provides real estate surveys for residential and commercial property transactions throughout Southwest Florida. Whether you're closing on a parcel, satisfying a lender requirement, or resolving a title issue, our surveys are formatted to meet the specific requirements of Florida title companies, attorneys, and lending institutions.

Mortgage and title company survey packages
Improvement location surveys (ILS)
Encroachment and easement identification
Closing timeline coordination
Residential and commercial properties
Signed and sealed by Florida-licensed PSM

08

Civil Engineering

Infrastructure engineered for Southwest Florida conditions.

Our licensed PEs design site infrastructure that performs in Southwest Florida's unique environment — high water tables, hurricane exposure, and strict SFWMD stormwater requirements. We engineer drainage, utilities, roads, and grading for residential and commercial developments.

Stormwater management and SFWMD compliance
Utility design — water, sewer, and dry utilities
Roadway and access design
Grading and earthwork plans

09

Site Planning

From concept to permitted site plan.

We develop comprehensive site plans that satisfy local zoning, county land development codes, and state agency requirements across Lee, Collier, Charlotte, Sarasota, and Manatee counties. Our plans are designed to move through the approval process efficiently.

Zoning and land use analysis
Conceptual and preliminary site layouts
Lot coverage, setback, and density calculations
Coordination with local planning departments

10

Permitting & Compliance

Navigate Southwest Florida's regulatory landscape.

Southwest Florida's permitting environment spans Lee County, Collier County, Charlotte County, Sarasota County, Manatee County, and SFWMD — requirements that can overlap and conflict. CE-SITE manages the full permitting process so your project doesn't stall in agency review.

Local building and site permit applications
SFWMD Environmental Resource Permits (ERP)
FDEP and environmental agency coordination
Response to agency requests for additional information
Our Process

How We Work

Step 01

Scope & Proposal

We review your parcel, project goals, and timeline, then deliver a clear scope and fixed-fee proposal within 48 hours.

Step 02

Field Work

Our licensed crews mobilize to your Southwest Florida site. We coordinate access, utilities, and any required notifications.

Step 03

Engineering & Design

Survey data feeds directly into our engineering workflow. No handoff delays between survey and design.

Step 04

Permit-Ready Deliverables

Final documents are formatted to Florida agency standards and delivered digitally, ready for submission.

Tell us about your project.

We'll scope it, price it, and tell you exactly what we need to get started.